Lake Decatur Shoreline Stabilization (2025) [2025-34]
The proposed project herein specified and described includes the following work: Placement of approximately 2,819 tons of stone riprap along sections of Lake Decatur shoreline, including brush removal and filter fabric.
PROJECT MANUAL
(click to expand/collapse)

Name | Size | ||
2025-34 Shoreline Stabilization Project Manual | 2.5 MB |