Lake Decatur Shoreline Stabilization (2025) [2025-34]
The proposed project herein specified and described includes the following work: Placement of approximately 2,819 tons of stone riprap along sections of Lake Decatur shoreline, including brush removal and filter fabric.
ADDENDUM #1
(click to expand/collapse)

Name | Size | |||
2025-34 Shorline Stabilization Project Addendum No 1-FINAL | 376.5 KB |