CDB #630-000-287 Construct Office/Maintenance, Cold Storage and Salt Storage

Riggston: Construction of a 5,760 gross square foot pre-engineered metal clear-span combination Office/Storage building. (Mixed Use: 1,920 SF of B Use Group & 3,840 SF of S-1 Use Group.) Building includes offices, restrooms, ready/break room, storage bays, connection to city water, septic/sand filter system, electrical, data, lighting, HVAC, man doors, overhead doors, concrete floor, concrete approach aprons, and perimeter concrete sidewalks. Alternate Bid G-1 includes demolition of the existing storage building. (D6610) Alternate Bid G-4 includes additional 30’x80’ concrete approach apron. Mt. Sterling: Construction of a 5,040 gross square foot pre-engineered, unheated, wood framed Storage building of S-1 Use Group. Building includes truck storage bays, electrical, lighting, ventilation, man doors, overhead doors, concrete floor, concrete approach aprons and gravel approach driveways. Alternate Bid G-3 includes additional 30’x60’ concrete approach apron and additional gravel driveway areas. Alternate Bid G-4 includes additional 20’x120’ East concrete approach apron and 20’x60’ West concrete approach apron. Quincy: Construction of a 4,800 gross square foot, pre-engineered wood framed, unheated Salt Storage building on 10’ high, reinforced concrete bunker walls. Building is S-2 Use Group. Building also includes a 30’x 120’ covered equipment storage area. Building includes is 20’ high x 24’ wide, with a 10’ wide gabled canopy salt entry opening, electrical, lighting, ventilation, concrete floor, concrete approach apron and gravel approach driveway. All reinforcing shall be epoxy coated. All concrete shall be finished with linseed oil. All covered storage areas shall have bird netting installed on the underside of the trusses. Alternate Bid G-2 includes providing
PLANS (click to expand/collapse)
Name Size
630-000-287_Plans 40.2 MB