Storm Drainage Improvements (2025) [2025-30]
The project includes the installation of approximately 150 feet of 12-inch RCP storm sewer and associated drainage structures along N. Redbud Ct. It also involves the rehabilitation of the existing drainage way along W. Karen Dr.. The restoration includes patching of driveways and roads, restoration of ditches, and seeding and mulching.