Country Club Road Boat Ramp Improvements Project (2025) [CP2024-33]

The proposed project includes the removal of the existing concrete boat ramp. Construction of a new concrete boat ramp and courtesy dock and placement of concrete block revetment mat and riprap around the ramp.
PROJECT MANUAL (click to expand/collapse)