CDB #630-000-287 Construct Office/Maintenance, Cold Storage and Salt Storage

Riggston: Construction of a 5,760 gross square foot pre-engineered metal clear-span combination Office/Storage building. (Mixed Use: 1,920 SF of B Use Group & 3,840 SF of S-1 Use Group.) Building includes offices, restrooms, ready/break room, storage bays, connection to city water, septic/sand filter system, electrical, data, lighting, HVAC, man doors, overhead doors, concrete floor, concrete approach aprons, and perimeter concrete sidewalks. Alternate Bid G-1 includes demolition of the existing storage building. (D6610) Alternate Bid G-4 includes additional 30’x80’ concrete approach apron. Mt. Sterling: Construction of a 5,040 gross square foot pre-engineered, unheated, wood framed Storage building of S-1 Use Group. Building includes truck storage bays, electrical, lighting, ventilation, man doors, overhead doors, concrete floor, concrete approach aprons and gravel approach driveways. Alternate Bid G-3 includes additional 30’x60’ concrete approach apron and additional gravel driveway areas. Alternate Bid G-4 includes additional 20’x120’ East concrete approach apron and 20’x60’ West concrete approach apron. Quincy: Construction of a 4,800 gross square foot, pre-engineered wood framed, unheated Salt Storage building on 10’ high, reinforced concrete bunker walls. Building is S-2 Use Group. Building also includes a 30’x 120’ covered equipment storage area. Building includes is 20’ high x 24’ wide, with a 10’ wide gabled canopy salt entry opening, electrical, lighting, ventilation, concrete floor, concrete approach apron and gravel approach driveway. All reinforcing shall be epoxy coated. All concrete shall be finished with linseed oil. All covered storage areas shall have bird netting installed on the underside of the trusses. Alternate Bid G-2 includes providing

Status

Accepting Bids

Prebid Date 10/22/25 10:00am
Bid Date 11/25/25 11:00am

Company & Contacts

BWC, Inc.
Scott Righter  

Location

Riggston, Mt. Sterling, & Quincy IL

One set of plans and specifications will be made available to General Contractor Bidders by submitting a refundable deposit in the form of a company check payable to BWC, Inc. in the amount of $100.00. ("Central Illinois Builders' Non-Cash Security Method for request of Documents" will be accepted on this Project.). Any additional sets desired by the General Contractor Bidders will be purchased by said Bidders at the Contractor's expense (on a non-refundable basis) through Decatur Blue Print Company in Decatur, IL. The refundable set of Plans (so long as set is in good condition) can be returned for deposit refund within ten (10) days after bid opening by contractors who submit valid bids. Checks shall be made payable to BWC, Inc. and delivered to, dropped off at, or mailed to: Decatur Blueprint, Inc., 230 West Wood Street, Decatur, IL 62523.

Alternately, a digital-only set may be downloaded through this website for $100. Digital-only purchases are non-refundable.

A Pre-bid meeting will be held on Wednesday, October 22, 2025 at 10:00 a.m. (Central Time), at: Mount Sterling Team Section Sub Headquarters; 100 Moreland Street; Mt Sterling, IL 62353

Bidders have the option to survey the Riggston and Quincy locations after the prebid meeting