Clarifier Conversion Project

The proposed project herein specified and described includes the following work: A. An eighteen (18) month project for the demolition of two existing clarifiers, the installation of two (2) new solids contact clarifiers, chemical feed system modifications and miscellaneous piping, electrical and structural modifications. The work includes, but is not limited to, sequencing, scheduling, coordinating, and managing the Project for the site demolition, excavation, rough grading, final grading, seeding, site erosion control, surface and subsurface drainage as needed; buried and aboveground (indoor) plant water and process water piping; reinforced concrete and miscellaneous equipment as shown in the contract drawings and specified herein.

Status

Accepting Bids

Prebid Date11/3/21 9:30am

Bid Date12/3/21 11:30am

Company & Contacts

Crawford Murphy & Tilly (CMT)

Amanda Withers   awithers@cmtengr.com

Location

Decatur, IL

Bid Documents can be purchased for a fee of $300 per printed set (plus shipping, where applicable; includes digital copy), or $75 for a digital-only copy. Purchases are non-refundable.

A MANDATORY PRE-BID will be held IN PERSON at the South Water Treatment Plant, 1155 South Martin Luther King Jr. Drive, Decatur, Illinois 62521 on Wednesday, November 3, 2021, at 9:30 A.M. In addition to project questions, the opportunity will be provided to discuss the City’s minority participation goals. Attendance is required for General Contractors to bid on the project.