2022 Storm Drainage Improvement Project

The proposed project herein specified and described includes the following work: 1. Country Club Road: Replace approximately 60 foot of 12” Storm Sewer pipe under roadway. 2. 34th Street: Replace approximately 55 foot of 30” Storm Sewer pipe under roadway. 3. Boiling Springs Road: Install Riprap along creek bank underneath and around bridge to control erosion. 4. Forest Crest: Replace approximately 55 foot of 36” Storm Sewer pipe under roadway. 5. Larry Drive: Reshape approximately 825 foot of roadway ditches, install approximately 195 foot of 12” CMP, and make connections to existing structures and piping. 6. Woodridge Court: Install approximately 60 foot of 4” Storm Sewer under drain, approximately 50 foot of 12” Storm Sewer, inlet structure under roadway.

Status

Bidding Closed

Prebid Date4/6/22 10:00am

Bid Date4/20/22 10:00am

Company & Contacts

City of Decatur - Public Works

Paul Caswell   PCaswell@decaturil.gov

Location

Decatur, IL

Bid Documents can be purchased for a fee of $65 per printed set (plus shipping, where applicable; includes digital copy), or $45 for a digital-only copy. Purchases are non-refundable.

A PRE-BID will be held by CONFERENCE CALL ONLY on Wednesday, April 6, 2022, at 10:00 A.M. In addition to project questions, the opportunity will be provided to discuss the City’s minority participation goals. To join the Conference call, please call 1-888-450-5996. When prompted please enter the passcode 133891.